09th Şubat 2026, Severe Accident (VSL Singapore)
Ensure that all projects prohibit the use of boom lift to transfer people (leading to have people going outside of the basket when at height)
Ekler :
Ensure that all projects have always, in the vicinity of any boom lift in operations, a trained ground operator able to maneuver the equipment in case of emergency
Conduct test/drills to verify that designated ground operators are able to maneuver the boom lift
SEVERE ACCIDENT - BOOM LIFT.pdf
-
06th Aralık 2019, PPE
Please ensure all workers bring correct PPE to site each day. Hard hats, steel-capped boots and glasses are mandatory.
-
06th Aralık 2019, Windy Weather
Winds exceeding 70km/ph expected on site from midday. Please ensure all loads are tied down and secure.
Geçerli Saha Hava Durumu
Son Güncelleme Saati: 20:31
Sıcaklık: 15C (App 14C)
Rüzgar Hızı: 11KMH
Maks. Rüzgar: 20KMH @19:21
Saat 9'dan beri yağmurlu: 0,0mm
Min Sıcaklık: 15C @07:39
Maks Sıcaklık: 22C @16:24
Bora: 15KMH
Maks Bora: 24KMH @19:21
Gözlem Konumu - Melbourne Airport, VICTORIA
Zaman Dilimi - Doğu Avustralya Standart Saati
Tahmin - Cuma, 20 Mart
Partly cloudy.
Min: 13C Maks: 23C
Yağmur İhtimali: 10%
Tahmin Konumu - Melbourne, VICTORIA
Zaman Dilimi - Doğu Avustralya Standart Saati
Yarın - Cumartesi, 21 Mart
Partly cloudy.
Min: 13C Maks: 28C
Yağmur İhtimali: 5%
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.
Bu sahanın KKD Gereksinimlerini biliyor musunuz?
Sahadaki ilk gününüzde doğru güvenlik ekipmanlarına sahip olduğunuzdan emin olun.
Sahaya geldiğinizde kısa süre içinde çalışmaya başlamak için hazırlanın.
Saha kaydınızı çevrimiçi tamamlayın ve zamandan kazanın.