09th února 2026, Severe Accident (VSL Singapore)
Ensure that all projects prohibit the use of boom lift to transfer people (leading to have people going outside of the basket when at height)
Přílohy :
Ensure that all projects have always, in the vicinity of any boom lift in operations, a trained ground operator able to maneuver the equipment in case of emergency
Conduct test/drills to verify that designated ground operators are able to maneuver the boom lift
SEVERE ACCIDENT - BOOM LIFT.pdf
-
06th prosince 2019, PPE
Please ensure all workers bring correct PPE to site each day. Hard hats, steel-capped boots and glasses are mandatory.
-
06th prosince 2019, Windy Weather
Winds exceeding 70km/ph expected on site from midday. Please ensure all loads are tied down and secure.
Aktuální počasí na pracovišti
Naposledy aktualizováno v: 20:31
Teplota: 15C (Aplikace 14C)
Rychlost větru: 11KMH
Max. vítr: 20KMH @19:21
Déšť od 9 ráno: 0,0mm
Min. teplota: 15C @7:39
Max. teplota: 22C @16:24
Náraz větru: 15KMH
Max náraz větru: 24KMH @19:21
Místo pozorování - Melbourne Airport, VICTORIA
Časové pásmo - východoaustralský standardní čas
Předpověď – pátek, 20 března
Partly cloudy.
Min: 13C Max: 23C
Možnost deště: 10%
Místo předpovědi – Melbourne, VICTORIA
Časové pásmo - východoaustralský standardní čas
Zítra - sobota, 21 března
Partly cloudy.
Min: 13C Max: 28C
Možnost deště: 5%
Znáte požadavky na OOPP pro toto pracoviště?
Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.
Po příjezdu na místo můžete začít pracovat dříve.
Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.
Znáte požadavky na OOPP pro toto pracoviště?
Ujistěte se, zda máte pro první den na pracovišti správné bezpečnostní vybavení.
Po příjezdu na místo můžete začít pracovat dříve.
Jakmile budete moci, dokončete registraci do pracoviště online, a ušetřete si tak čas.