Training Project - Site proiect public
-
09th februarie 2026, Severe Accident (VSL Singapore)
Ensure that all projects prohibit the use of boom lift to transfer people (leading to have people going outside of the basket when at height)
Anexe :
Ensure that all projects have always, in the vicinity of any boom lift in operations, a trained ground operator able to maneuver the equipment in case of emergency
Conduct test/drills to verify that designated ground operators are able to maneuver the boom lift
SEVERE ACCIDENT - BOOM LIFT.pdf
-
06th decembrie 2019, PPE
Please ensure all workers bring correct PPE to site each day. Hard hats, steel-capped boots and glasses are mandatory.
-
06th decembrie 2019, Windy Weather
Winds exceeding 70km/ph expected on site from midday. Please ensure all loads are tied down and secure.
Condiții meteo curente la șantier
Ultima actualizare la: 20:31
Temperatură: 15C (Aplicație 14C)
Viteza vântului: 11KMH
Max. Vânt: 20KMH @19:21
Ploaie de la 9 AM: 0,0mm
Temp min: 15C @07:39
Temp max: 22C @16:24
Rafală: 15KMH
Rafală max: 24KMH @19:21
Locație observație - Melbourne Airport, VICTORIA
Fus orar - Ora standard a Australiei Orientale
Prognoză - vineri, 20 martie
Partly cloudy.
Min: 13C Max: 23C
Șanse de ploaie: 10%
Locație prognoză - Melbourne, VICTORIA
Fus orar - Ora standard a Australiei Orientale
Mâine - sâmbătă, 21 martie
Partly cloudy.
Min: 13C Max: 28C
Șanse de ploaie: 5%
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.
Cunoașteți cerințele EIP pentru acest șantier?
Asigurați-vă că aveți echipamentul de siguranță corect pentru prima zi la locație.
Începeți să lucrați mai devreme atunci când ajungeți în locație.
Finalizați înregistrarea la șantier online când doriți și economisiți timp.