09th febrero 2026, Severe Accident (VSL Singapore)
Ensure that all projects prohibit the use of boom lift to transfer people (leading to have people going outside of the basket when at height)
Archivos adjuntos :
Ensure that all projects have always, in the vicinity of any boom lift in operations, a trained ground operator able to maneuver the equipment in case of emergency
Conduct test/drills to verify that designated ground operators are able to maneuver the boom lift
SEVERE ACCIDENT - BOOM LIFT.pdf
-
06th diciembre 2019, PPE
Please ensure all workers bring correct PPE to site each day. Hard hats, steel-capped boots and glasses are mandatory.
-
06th diciembre 2019, Windy Weather
Winds exceeding 70km/ph expected on site from midday. Please ensure all loads are tied down and secure.
Tiempo en Obra actual
Última actualización el: 8:31 PM
Temperatura: 15C (Aplicación 14C)
Velocidad del viento: 11MPH
Máx. Viento: 20MPH @7:21 PM
Lluvia desde las 9 a.m.: 0.0mm
Temp mín: 15C @7:39 AM
Temp máx: 22C @4:24 PM
Ráfaga: 15MPH
Ráfagas máx: 24MPH @7:21 PM
Lugar de observación - Melbourne Airport, VICTORIA
Zona horaria - hora estándar de Australia oriental
Pronóstico - viernes, 20 marzo
Partly cloudy.
Mín: 13C Máx: 23C
Probabilidad de lluvia: 10%
Lugar de la previsión - Melbourne, VICTORIA
Zona horaria - hora estándar de Australia oriental
Mañana - sábado, 21 marzo
Partly cloudy.
Mín: 13C Máx: 28C
Probabilidad de lluvia: 5%
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.